MG Masonry "Heavily Damaged Building Project"

Before Major Repairs

This Building had Major Spalding and Structual Cracks. The extent of the damage was extreme.
We counted close to 900LF of Structual Cracks and several areas where there was severe Concrete Spalding, leaving chunks of the building to fall away.


After Major Repairs

The Buildings major Spalding and Structual Cracks were all repaired using Technologically Advanced Techniques.
The Structual Cracks were repaired using a Presssure Injection System in which Structual Epoxy was injected into the Structual Cracks filling them solid and making them water tight, a permanente Solution for Structual Cracks.

The Concrete Spalding was repaired using Technologically Advanced Concrete. Components of this Advanced Concrete consists of a Bonding agent which guarantees a Structual Bond to the existing building. It also consists of Corrosion Inhibitors which protects existing Structual Steel from damage and the surrounding concrete also. One of the most unique components of the concrete is the Specially designed Fiber Reinforcement used in it to guarantee the highest quality repair possible.